Energy saving ball mill is a kind of grinding equipment which can meet the development demand through certain optimization and innovation on the basis of ball mill. With the advantages of high grinding efficiency, less dust, low noise and energy saving, it is widely used in cement, new building materials, chemical fertilizer and nonferrous metal processing industries, and is favored by users in the market.

 ball grinding mill

All parts of the equipment have their service life. In the process of long-term use, the steel ball as the main grinding medium will have certain wear due to the collision with minerals in the long-term production and processing. However, in order to ensure the grinding efficiency, it is necessary to add steel balls to the ball mill regularly. However, many users do not know how to judge the ball repair of the energy-saving ball mill Time and the amount of ball, the following red star machine to do some simple introduction for users.

 ball grinding mill

For the addition of energy-saving ball mill steel ball, generally, when installing the machine, the manufacturer will install different sizes of steel balls according to the equipment model and its output, and then install the steel balls of different sizes according to a certain proportion. Because in the later stage, the larger steel balls will be gradually worn out in the operation, so when adding steel balls, users only need to The size of steel ball can be added. In each ball repair process, try to ensure that the amount of steel balls in the equipment remains unchanged. When and how much steel balls should be added can be judged from the following aspects.

 ball grinding mill

1. A special person is responsible for the equipment to record the wear amount of steel balls in the energy-saving ball mill. The user can take this record as a reference.

2. The reduction of the amount of steel balls inside the energy-saving ball mill does not have a great impact on the crushing capacity of the steel balls at the beginning, but the wear efficiency of the steel balls is effective at this time. Therefore, if the production efficiency of the equipment decreases in operation, the user should first determine whether it is time to add steel balls.

3. Operators can judge whether steel balls need to be added according to the size, height, speed, grinding method and production capacity of steel balls. Generally speaking, each shift of energy-saving ball mill is changed, operators should add steel balls, which can effectively ensure that there are enough steel balls in the ball mill.

 ball grinding mill

Users in the production, if the addition of steel balls and other problems still do not understand, you can consult by telephone 0371—67772626 According to your actual production situation, our staff will put forward some reasonable suggestions for you, so as to ensure the efficiency and continuity of users in production.